The Butler Field

New Information:

updated Sept. 30, 2011

Deseret News Article: "Construction Begins on new Butler Middle School"

Click above to read article


Butler Middle School
Cottonwood Heights, Utah
Canyons School District


This information was handed out and shared with the community at the Groundbreaking Ceremony


*Information provided by Canyons District, VCBO Architects and Hughes Construction



The new Butler Middle School is designed around the concept of integrated curriculum, collaborative learning and teaching. The 177,000 square foot building will be divided into smaller populations by utilizing small learning centers or “Education Communities”. The Education Communities are comprised of science classrooms/labs, project classrooms and teacher offices.
A committee of over 30 teachers, administrators, patrons and students, made up the design/building committee. VCBO Architecture, as facilitator, spent several months developing the concept plan and schematic design through multiple meetings, numerous onsite tours, and various work sessions with the committee. The final design is a two story structure that incorporates the latest state-of-the-art technology.


The key to the design solution is the arrangement of the classrooms into three separate, grade-level specific academic learning centers, each surrounding and connected to a lively central collaboration space. A fourth academic house contains arts, computer science, shops and FCS classrooms. These academic “houses” provide a highly flexible, open, and extremely visible environments for group collaboration, which foster critical student/student and student/teacher relationships. Each house also contains planning offices, separate student and faculty toilet rooms, and grade-specific lockers, promoting a cohesive environment in which students may live and learn.

Butler Middle School Fact Sheet


• Full administration and counseling facilities
• 1,000 seat “state of the art” auditorium theater with a scene shop at the back of the theater, which will have its own designated entrance and lobby for the community.
• Music suite that includes: instrument/band and choir rooms, practice rooms, offices and a music library
• Large central commons space which also serves as a cafeteria with five serving counters from a large kitchen
• Gymnasium with two full courts that utilize a central dividing curtain, 12 basketball hoops, two large locker rooms, two fitness rooms dedicated to dance and strength training and an elevated indoor running track with special running surface floor covering that surrounds the entire gymnasium
• Fully integrated I.T. computer suites/labs and media center with green screen TV production studio
• Wireless capabilities throughout the entire school
• School colors and mascot will be retained in the new school and were utilized in the interior color scheme and exterior palette


Butler Images Updated!

updated July 17, 2011

Eastside Image

RENDERING-east

Northeast Image

RENDERING-northeast

West Image

RENDERING-west

New Butler Site Images

updated May 17, 2011

Front of the School

bms_front_web

Auditorium Entrance

BMS_aud_web

Floor Plan (Main Level)

floor_plan_web

Overhead Site Plan

overhead_plan

Butler Middle School Rebuild

March 2, 2011

Link to new Bond Information

 

February 15, 2011

Link to Butler Middle Site Plan

January 26, 2011

-       The Canyons Board of Education has approved a site plan which will leave the students in place and uninterrupted in the existing Butler Middle School while a new middle school is constructed directly behind the building.

-       VCBO hired as architects

-       Hughes Construction hired as general contractors

-       A “Blue Sky” meeting with the committee and VCBO was held to discuss preliminary possibilities of a future structure

-       VCBO has met with stakeholders (teachers, parents, students, community members) of Butler to seek input

-       Examples of VCBO buildings include Salt Lake City Library, Sunset Ridge Middle School (Jordan), Vista Heights Middle School (Alpine) and Wasatch Jr. High School (Granite)

-       The new facility is expected to serve the Cottonwood Heights community for 50+ years

-       There will be some inconvenience for everyone

-       Canyons School District and BMS Administration are committed to make the transition as smooth as possible

-       Anticipated Time Line:              Begin June 2011,  Completion January 2013




Letter from Superintendent Doty

Dec. 15, 2010

 

Thanks to you and voters throughout the Canyons School District, the District held its first successful bond election in June 2010, which authorized the Board of Education to issue up to $250 million in bonds for the construction and renovation of school facilities in our borders.





We are pleased that one of the first projects to be funded by this bond is a complete rebuild of Butler Middle School. This project, which is scheduled to begin in summer 2011, will completely replace the existing school with a state-of-the-art new facility.





A Town Hall Meeting will be held on Thursday, Jan. 20, 2011, at 6 p.m. in the Butler Middle School Auditorium. There, District officials will provide information and seek input from you on the following:



·         Butler Middle School facility concepts by VCBO Architects



·         Costs and construction timeline



·         Services for Butler Middle School students during the period of construction





This meeting will deal exclusively with issues related to Butler Middle School. We acknowledge many of you also have students at Butler Elementary School, and we are pleased with the community’s desire to learn more about the elementary school building project. However, public meetings on the future of Butler Elementary School will be held in the months to come.





We invite you to join us on Jan. 20, and look forward to working closely with you in the coming months as we move forward with the plan to replace the existing Butler Middle School with a state-of-the-art educational facility for students and employees.





Sincerely,



David S. Doty, Superintendent

Butler Middle School Rebuild Fact Sheet            

Information from School Community Council Meeting (Oct. 27, 2010)






-       VCBO hired as architects

-       This will be a rebuild of Butler Middle School, not a remodel



-       There is no intention of moving the 9th grade students to the high school until the scheduled reconfiguration of Canyons School District



-       A committee comprised of Canyons School District administrators representing all facets of daily operations has been formed and will continue to expand



-       A “Blue Sky” meeting with the committee and VCBO was held to discuss any and all preliminary possibilities of a future structure



-       VCBO will meet with stakeholders (teachers, parents, students, community members) of Butler to seek input



-       VCBO will tour our existing facility



-       Mrs. Morgan and Mr. Graham have toured other VCBO existing buildings



-       Examples of VCBO buildings include Salt Lake City Library, Sunset Ridge Middle School (Jordan), Vista Heights Middle School (Alpine) and Wasatch Jr. High School (Granite)



-       The specific building site for Butler and floor plan is still TBD



-       The new facility is expected to serve the Cottonwood Heights community for 50-75 years



-       There will be some inconvenience for everyone



-       We, as a district and as a school, are committed to make the transition as smooth as possible



-       Not everyone is going to get everything they want



-       The process will be one of priorities and compromise



-       All decisions made will have both immediate and long term effects





-       Anticipated Time Line:              Begin June 2011,  Completion January 2013